Importance subsampling: improving power system planning under climate-based uncertainty

Recent studies indicate that the effects of inter-annual climate-based variability in power system planning are significant and that long samples of demand & weather data (spanning multiple decades) should be considered. At the same time, modelling renewable generation such as solar and wind req...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:arXiv.org 2019-03
Hauptverfasser: Hilbers, Adriaan P, Brayshaw, David J, Gandy, Axel
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title arXiv.org
container_volume
creator Hilbers, Adriaan P
Brayshaw, David J
Gandy, Axel
description Recent studies indicate that the effects of inter-annual climate-based variability in power system planning are significant and that long samples of demand & weather data (spanning multiple decades) should be considered. At the same time, modelling renewable generation such as solar and wind requires high temporal resolution to capture fluctuations in output levels. In many realistic power system models, using long samples at high temporal resolution is computationally unfeasible. This paper introduces a novel subsampling approach, referred to as "importance subsampling", allowing the use of multiple decades of demand & weather data in power system planning models at reduced computational cost. The methodology can be applied in a wide class of optimisation-based power system simulations. A test case is performed on a model of the United Kingdom created using the open-source modelling framework Calliope and 36 years of hourly demand and wind data. Standard data reduction approaches such as using individual years or clustering into representative days lead to significant errors in estimates of optimal system design. Furthermore, the resultant power systems lead to supply capacity shortages, raising questions of generation capacity adequacy. In contrast, "importance subsampling" leads to accurate estimates of optimal system design at greatly reduced computational cost, with resultant power systems able to meet demand across all 36 years of demand & weather scenarios.
doi_str_mv 10.48550/arxiv.1903.10916
format Article
fullrecord <record><control><sourceid>proquest_arxiv</sourceid><recordid>TN_cdi_arxiv_primary_1903_10916</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2232287976</sourcerecordid><originalsourceid>FETCH-LOGICAL-a526-f7635e36691d8f3bef1a96eb7b36638da15941d123628083c24239c112fed3ae3</originalsourceid><addsrcrecordid>eNotj11LwzAUhoMgOOZ-gFcWvG5NzmnSxDsZfgwG3gy8LGmTSkeb1qSd7t-bbV6dw8PLy_sQcsdolkvO6aP2v-0hY4pixqhi4oosAJGlMge4IasQ9pRSEAVwjgvyuenHwU_a1TYJcxV0P3at-3pK2n70wyG-yTj8WJ-EY5hsn4yddu5EZ2cirbu215NNKx2siay2sat10_GWXDe6C3b1f5dk9_qyW7-n24-3zfp5m2oOIm0KgdyiEIoZ2WBlG6aVsFVRRYbSaMZVzgwDFCCpxBpyQFUzBo01qC0uyf2l9mxdjj7O8cfyZF-e7WPi4ZKIOt-zDVO5H2bv4qYSAAFkoeKIP1ObXg0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2232287976</pqid></control><display><type>article</type><title>Importance subsampling: improving power system planning under climate-based uncertainty</title><source>arXiv.org</source><source>Free E- Journals</source><creator>Hilbers, Adriaan P ; Brayshaw, David J ; Gandy, Axel</creator><creatorcontrib>Hilbers, Adriaan P ; Brayshaw, David J ; Gandy, Axel</creatorcontrib><description>Recent studies indicate that the effects of inter-annual climate-based variability in power system planning are significant and that long samples of demand &amp; weather data (spanning multiple decades) should be considered. At the same time, modelling renewable generation such as solar and wind requires high temporal resolution to capture fluctuations in output levels. In many realistic power system models, using long samples at high temporal resolution is computationally unfeasible. This paper introduces a novel subsampling approach, referred to as "importance subsampling", allowing the use of multiple decades of demand &amp; weather data in power system planning models at reduced computational cost. The methodology can be applied in a wide class of optimisation-based power system simulations. A test case is performed on a model of the United Kingdom created using the open-source modelling framework Calliope and 36 years of hourly demand and wind data. Standard data reduction approaches such as using individual years or clustering into representative days lead to significant errors in estimates of optimal system design. Furthermore, the resultant power systems lead to supply capacity shortages, raising questions of generation capacity adequacy. In contrast, "importance subsampling" leads to accurate estimates of optimal system design at greatly reduced computational cost, with resultant power systems able to meet demand across all 36 years of demand &amp; weather scenarios.</description><identifier>EISSN: 2331-8422</identifier><identifier>DOI: 10.48550/arxiv.1903.10916</identifier><language>eng</language><publisher>Ithaca: Cornell University Library, arXiv.org</publisher><subject>Adequacy ; Climate models ; Clustering ; Computational efficiency ; Computer simulation ; Data reduction ; Demand ; Meteorological data ; Optimization ; Shortages ; Standard data ; Statistics - Applications ; Systems design ; Temporal resolution ; Variations</subject><ispartof>arXiv.org, 2019-03</ispartof><rights>2019. This work is published under http://arxiv.org/licenses/nonexclusive-distrib/1.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><rights>http://arxiv.org/licenses/nonexclusive-distrib/1.0</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>228,230,776,780,881,27904</link.rule.ids><backlink>$$Uhttps://doi.org/10.48550/arXiv.1903.10916$$DView paper in arXiv$$Hfree_for_read</backlink><backlink>$$Uhttps://doi.org/10.1016/j.apenergy.2019.04.110$$DView published paper (Access to full text may be restricted)$$Hfree_for_read</backlink></links><search><creatorcontrib>Hilbers, Adriaan P</creatorcontrib><creatorcontrib>Brayshaw, David J</creatorcontrib><creatorcontrib>Gandy, Axel</creatorcontrib><title>Importance subsampling: improving power system planning under climate-based uncertainty</title><title>arXiv.org</title><description>Recent studies indicate that the effects of inter-annual climate-based variability in power system planning are significant and that long samples of demand &amp; weather data (spanning multiple decades) should be considered. At the same time, modelling renewable generation such as solar and wind requires high temporal resolution to capture fluctuations in output levels. In many realistic power system models, using long samples at high temporal resolution is computationally unfeasible. This paper introduces a novel subsampling approach, referred to as "importance subsampling", allowing the use of multiple decades of demand &amp; weather data in power system planning models at reduced computational cost. The methodology can be applied in a wide class of optimisation-based power system simulations. A test case is performed on a model of the United Kingdom created using the open-source modelling framework Calliope and 36 years of hourly demand and wind data. Standard data reduction approaches such as using individual years or clustering into representative days lead to significant errors in estimates of optimal system design. Furthermore, the resultant power systems lead to supply capacity shortages, raising questions of generation capacity adequacy. In contrast, "importance subsampling" leads to accurate estimates of optimal system design at greatly reduced computational cost, with resultant power systems able to meet demand across all 36 years of demand &amp; weather scenarios.</description><subject>Adequacy</subject><subject>Climate models</subject><subject>Clustering</subject><subject>Computational efficiency</subject><subject>Computer simulation</subject><subject>Data reduction</subject><subject>Demand</subject><subject>Meteorological data</subject><subject>Optimization</subject><subject>Shortages</subject><subject>Standard data</subject><subject>Statistics - Applications</subject><subject>Systems design</subject><subject>Temporal resolution</subject><subject>Variations</subject><issn>2331-8422</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><sourceid>BENPR</sourceid><sourceid>GOX</sourceid><recordid>eNotj11LwzAUhoMgOOZ-gFcWvG5NzmnSxDsZfgwG3gy8LGmTSkeb1qSd7t-bbV6dw8PLy_sQcsdolkvO6aP2v-0hY4pixqhi4oosAJGlMge4IasQ9pRSEAVwjgvyuenHwU_a1TYJcxV0P3at-3pK2n70wyG-yTj8WJ-EY5hsn4yddu5EZ2cirbu215NNKx2siay2sat10_GWXDe6C3b1f5dk9_qyW7-n24-3zfp5m2oOIm0KgdyiEIoZ2WBlG6aVsFVRRYbSaMZVzgwDFCCpxBpyQFUzBo01qC0uyf2l9mxdjj7O8cfyZF-e7WPi4ZKIOt-zDVO5H2bv4qYSAAFkoeKIP1ObXg0</recordid><startdate>20190326</startdate><enddate>20190326</enddate><creator>Hilbers, Adriaan P</creator><creator>Brayshaw, David J</creator><creator>Gandy, Axel</creator><general>Cornell University Library, arXiv.org</general><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>L6V</scope><scope>M7S</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope><scope>EPD</scope><scope>GOX</scope></search><sort><creationdate>20190326</creationdate><title>Importance subsampling: improving power system planning under climate-based uncertainty</title><author>Hilbers, Adriaan P ; Brayshaw, David J ; Gandy, Axel</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a526-f7635e36691d8f3bef1a96eb7b36638da15941d123628083c24239c112fed3ae3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Adequacy</topic><topic>Climate models</topic><topic>Clustering</topic><topic>Computational efficiency</topic><topic>Computer simulation</topic><topic>Data reduction</topic><topic>Demand</topic><topic>Meteorological data</topic><topic>Optimization</topic><topic>Shortages</topic><topic>Standard data</topic><topic>Statistics - Applications</topic><topic>Systems design</topic><topic>Temporal resolution</topic><topic>Variations</topic><toplevel>online_resources</toplevel><creatorcontrib>Hilbers, Adriaan P</creatorcontrib><creatorcontrib>Brayshaw, David J</creatorcontrib><creatorcontrib>Gandy, Axel</creatorcontrib><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering Collection</collection><collection>arXiv Statistics</collection><collection>arXiv.org</collection><jtitle>arXiv.org</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hilbers, Adriaan P</au><au>Brayshaw, David J</au><au>Gandy, Axel</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Importance subsampling: improving power system planning under climate-based uncertainty</atitle><jtitle>arXiv.org</jtitle><date>2019-03-26</date><risdate>2019</risdate><eissn>2331-8422</eissn><abstract>Recent studies indicate that the effects of inter-annual climate-based variability in power system planning are significant and that long samples of demand &amp; weather data (spanning multiple decades) should be considered. At the same time, modelling renewable generation such as solar and wind requires high temporal resolution to capture fluctuations in output levels. In many realistic power system models, using long samples at high temporal resolution is computationally unfeasible. This paper introduces a novel subsampling approach, referred to as "importance subsampling", allowing the use of multiple decades of demand &amp; weather data in power system planning models at reduced computational cost. The methodology can be applied in a wide class of optimisation-based power system simulations. A test case is performed on a model of the United Kingdom created using the open-source modelling framework Calliope and 36 years of hourly demand and wind data. Standard data reduction approaches such as using individual years or clustering into representative days lead to significant errors in estimates of optimal system design. Furthermore, the resultant power systems lead to supply capacity shortages, raising questions of generation capacity adequacy. In contrast, "importance subsampling" leads to accurate estimates of optimal system design at greatly reduced computational cost, with resultant power systems able to meet demand across all 36 years of demand &amp; weather scenarios.</abstract><cop>Ithaca</cop><pub>Cornell University Library, arXiv.org</pub><doi>10.48550/arxiv.1903.10916</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier EISSN: 2331-8422
ispartof arXiv.org, 2019-03
issn 2331-8422
language eng
recordid cdi_arxiv_primary_1903_10916
source arXiv.org; Free E- Journals
subjects Adequacy
Climate models
Clustering
Computational efficiency
Computer simulation
Data reduction
Demand
Meteorological data
Optimization
Shortages
Standard data
Statistics - Applications
Systems design
Temporal resolution
Variations
title Importance subsampling: improving power system planning under climate-based uncertainty
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T02%3A01%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_arxiv&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Importance%20subsampling:%20improving%20power%20system%20planning%20under%20climate-based%20uncertainty&rft.jtitle=arXiv.org&rft.au=Hilbers,%20Adriaan%20P&rft.date=2019-03-26&rft.eissn=2331-8422&rft_id=info:doi/10.48550/arxiv.1903.10916&rft_dat=%3Cproquest_arxiv%3E2232287976%3C/proquest_arxiv%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2232287976&rft_id=info:pmid/&rfr_iscdi=true