How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation

Journal of the American Planning Association, vol. 71, no. 2, Spring 2005, 131-146 This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Flyvbjerg, Bent, Holm, Mette Skamris, Buhl, Søren L
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Flyvbjerg, Bent
Holm, Mette Skamris
Buhl, Søren L
description Journal of the American Planning Association, vol. 71, no. 2, Spring 2005, 131-146 This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth US$59 billion. The study shows with very high statistical significance that forecasters generally do a poor job of estimating the demand for transportation infrastructure projects. The result is substantial downside financial and economic risks. Such risks are typically ignored or downplayed by planners and decision makers, to the detriment of social and economic welfare. For nine out of ten rail projects passenger forecasts are overestimated; average overestimation is 106 percent. This results in large benefit shortfalls for rail projects. For half of all road projects the difference between actual and forecasted traffic is more than plus/minus 20 percent. Forecasts have not become more accurate over the 30-year period studied. If techniques and skills for arriving at accurate demand forecasts have improved over time, as often claimed by forecasters, this does not show in the data. The causes of inaccuracy in forecasts are different for rail and road projects, with political causes playing a larger role for rail than for road. The cure is transparency, accountability, and new forecasting methods. The challenge is to change the governance structures for forecasting and project development. The article shows how planners may help achieve this.
doi_str_mv 10.48550/arxiv.1303.6654
format Article
fullrecord <record><control><sourceid>arxiv_GOX</sourceid><recordid>TN_cdi_arxiv_primary_1303_6654</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1303_6654</sourcerecordid><originalsourceid>FETCH-LOGICAL-a654-e5466ae5a5e739a89ac26702a49b43ab800b2937eef4b0de80dd111398851dfc3</originalsourceid><addsrcrecordid>eNotzz1PwzAUhWEvDKiwM6E7wpBgx3biTKgKlFaqRIdISCzRtXMjAq1d2Skf_x4KTGd7dR7GLgTPldGa32D8HN9zIbnMy1KrU_a8DB9wtfLX6Nwh4kQwjwR3tEPfwyJEcpimBKOHzcFuRwdPIb4l2MTwSm5Kt9C-EDSYCMIAbUSf9iFOOI3Bn7GTAbeJzv93xtrFfdsss_Xjw6qZrzP8eZCRVmWJpFFTJWs0NbqirHiBqrZKojWc26KWFdGgLO_J8L4XQsjaGC36wckZu_zL_tq6fRx3GL-6o7E7GuU3RJ1Lrw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation</title><source>arXiv.org</source><creator>Flyvbjerg, Bent ; Holm, Mette Skamris ; Buhl, Søren L</creator><creatorcontrib>Flyvbjerg, Bent ; Holm, Mette Skamris ; Buhl, Søren L</creatorcontrib><description>Journal of the American Planning Association, vol. 71, no. 2, Spring 2005, 131-146 This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth US$59 billion. The study shows with very high statistical significance that forecasters generally do a poor job of estimating the demand for transportation infrastructure projects. The result is substantial downside financial and economic risks. Such risks are typically ignored or downplayed by planners and decision makers, to the detriment of social and economic welfare. For nine out of ten rail projects passenger forecasts are overestimated; average overestimation is 106 percent. This results in large benefit shortfalls for rail projects. For half of all road projects the difference between actual and forecasted traffic is more than plus/minus 20 percent. Forecasts have not become more accurate over the 30-year period studied. If techniques and skills for arriving at accurate demand forecasts have improved over time, as often claimed by forecasters, this does not show in the data. The causes of inaccuracy in forecasts are different for rail and road projects, with political causes playing a larger role for rail than for road. The cure is transparency, accountability, and new forecasting methods. The challenge is to change the governance structures for forecasting and project development. The article shows how planners may help achieve this.</description><identifier>DOI: 10.48550/arxiv.1303.6654</identifier><language>eng</language><subject>Quantitative Finance - General Finance</subject><creationdate>2013-03</creationdate><rights>http://arxiv.org/licenses/nonexclusive-distrib/1.0</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>228,230,780,885</link.rule.ids><linktorsrc>$$Uhttps://arxiv.org/abs/1303.6654$$EView_record_in_Cornell_University$$FView_record_in_$$GCornell_University$$Hfree_for_read</linktorsrc><backlink>$$Uhttps://doi.org/10.48550/arXiv.1303.6654$$DView paper in arXiv$$Hfree_for_read</backlink></links><search><creatorcontrib>Flyvbjerg, Bent</creatorcontrib><creatorcontrib>Holm, Mette Skamris</creatorcontrib><creatorcontrib>Buhl, Søren L</creatorcontrib><title>How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation</title><description>Journal of the American Planning Association, vol. 71, no. 2, Spring 2005, 131-146 This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth US$59 billion. The study shows with very high statistical significance that forecasters generally do a poor job of estimating the demand for transportation infrastructure projects. The result is substantial downside financial and economic risks. Such risks are typically ignored or downplayed by planners and decision makers, to the detriment of social and economic welfare. For nine out of ten rail projects passenger forecasts are overestimated; average overestimation is 106 percent. This results in large benefit shortfalls for rail projects. For half of all road projects the difference between actual and forecasted traffic is more than plus/minus 20 percent. Forecasts have not become more accurate over the 30-year period studied. If techniques and skills for arriving at accurate demand forecasts have improved over time, as often claimed by forecasters, this does not show in the data. The causes of inaccuracy in forecasts are different for rail and road projects, with political causes playing a larger role for rail than for road. The cure is transparency, accountability, and new forecasting methods. The challenge is to change the governance structures for forecasting and project development. The article shows how planners may help achieve this.</description><subject>Quantitative Finance - General Finance</subject><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2013</creationdate><recordtype>article</recordtype><sourceid>GOX</sourceid><recordid>eNotzz1PwzAUhWEvDKiwM6E7wpBgx3biTKgKlFaqRIdISCzRtXMjAq1d2Skf_x4KTGd7dR7GLgTPldGa32D8HN9zIbnMy1KrU_a8DB9wtfLX6Nwh4kQwjwR3tEPfwyJEcpimBKOHzcFuRwdPIb4l2MTwSm5Kt9C-EDSYCMIAbUSf9iFOOI3Bn7GTAbeJzv93xtrFfdsss_Xjw6qZrzP8eZCRVmWJpFFTJWs0NbqirHiBqrZKojWc26KWFdGgLO_J8L4XQsjaGC36wckZu_zL_tq6fRx3GL-6o7E7GuU3RJ1Lrw</recordid><startdate>20130320</startdate><enddate>20130320</enddate><creator>Flyvbjerg, Bent</creator><creator>Holm, Mette Skamris</creator><creator>Buhl, Søren L</creator><scope>GOX</scope></search><sort><creationdate>20130320</creationdate><title>How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation</title><author>Flyvbjerg, Bent ; Holm, Mette Skamris ; Buhl, Søren L</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a654-e5466ae5a5e739a89ac26702a49b43ab800b2937eef4b0de80dd111398851dfc3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2013</creationdate><topic>Quantitative Finance - General Finance</topic><toplevel>online_resources</toplevel><creatorcontrib>Flyvbjerg, Bent</creatorcontrib><creatorcontrib>Holm, Mette Skamris</creatorcontrib><creatorcontrib>Buhl, Søren L</creatorcontrib><collection>arXiv.org</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Flyvbjerg, Bent</au><au>Holm, Mette Skamris</au><au>Buhl, Søren L</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation</atitle><date>2013-03-20</date><risdate>2013</risdate><abstract>Journal of the American Planning Association, vol. 71, no. 2, Spring 2005, 131-146 This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth US$59 billion. The study shows with very high statistical significance that forecasters generally do a poor job of estimating the demand for transportation infrastructure projects. The result is substantial downside financial and economic risks. Such risks are typically ignored or downplayed by planners and decision makers, to the detriment of social and economic welfare. For nine out of ten rail projects passenger forecasts are overestimated; average overestimation is 106 percent. This results in large benefit shortfalls for rail projects. For half of all road projects the difference between actual and forecasted traffic is more than plus/minus 20 percent. Forecasts have not become more accurate over the 30-year period studied. If techniques and skills for arriving at accurate demand forecasts have improved over time, as often claimed by forecasters, this does not show in the data. The causes of inaccuracy in forecasts are different for rail and road projects, with political causes playing a larger role for rail than for road. The cure is transparency, accountability, and new forecasting methods. The challenge is to change the governance structures for forecasting and project development. The article shows how planners may help achieve this.</abstract><doi>10.48550/arxiv.1303.6654</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier DOI: 10.48550/arxiv.1303.6654
ispartof
issn
language eng
recordid cdi_arxiv_primary_1303_6654
source arXiv.org
subjects Quantitative Finance - General Finance
title How (In)accurate Are Demand Forecasts in Public Works Projects? The Case of Transportation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T23%3A23%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-arxiv_GOX&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=How%20(In)accurate%20Are%20Demand%20Forecasts%20in%20Public%20Works%20Projects?%20The%20Case%20of%20Transportation&rft.au=Flyvbjerg,%20Bent&rft.date=2013-03-20&rft_id=info:doi/10.48550/arxiv.1303.6654&rft_dat=%3Carxiv_GOX%3E1303_6654%3C/arxiv_GOX%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true